Project Introduction
It is a shoe factory workshop, the owner required build office inside the workshop, so we designed a small office mezzanine floor there for the management worker there. And the owner told us he need a big canopy at workshop side, in order to load and unload his products and raw materials, so we designed a huge canopy there at one side.




Design Parameter
Building designed wind loading speed :Wind load≥120km/h.
Building life time: 50 years.
Steel structure materials: standard Q235 steel.
Roof&wall sheet: small thickness sheet(V-840 and V900) with white color.
Roof&wall purlin(Q235 steel) :C section Galvanized Steel Purlin
Production & Shipping
32 days for production.
45 days for shipping from China to Tanzania.
Installation
98 days for installation, all the assemble and construction work done by client himself locally, it is important to find a professional construction company locally.
Client Feedback
The owner is happy with our product quality and long life time, and satisfy with our design work, all design idea follow his mind.
